tappsman
03-26-2009, 01:55 PM
The estimated time from Part Works is always substantially less that it actually takes to carve. For instance yesterday I cut a design that PW estimated would take 25 minutes. The actual cutting time was approximately 80 minutes.
Am I doing something wrong or is it a glitch in the PW software.
DJ
Am I doing something wrong or is it a glitch in the PW software.
DJ