maginter
02-01-2008, 06:02 PM
Hi All -
I have been following the thread on the hold down table and have a design I want to implement. Like all of us, I am trying to accomidate any possible configuration that I would encounter. My thought is to have eight zones, each a 2' x 2' square. I also want to rin the t-track down the segments so I can side clamp. I am even working on an idea that allows for a segmented spoil board. The issue there is maintaing complete flatness across the entire table.... Still working that one.
For a vacuum, I will be building a 9-15 box using two VBTST6460VM. Just talking with Ward has got me thinking of having the ability to do series or parallel capability with the blowers. This offers several additional options. It complicates the plumbing, but not to much. I will post pictures when I have something....
Any comments?
TIA,
Mark
I have been following the thread on the hold down table and have a design I want to implement. Like all of us, I am trying to accomidate any possible configuration that I would encounter. My thought is to have eight zones, each a 2' x 2' square. I also want to rin the t-track down the segments so I can side clamp. I am even working on an idea that allows for a segmented spoil board. The issue there is maintaing complete flatness across the entire table.... Still working that one.
For a vacuum, I will be building a 9-15 box using two VBTST6460VM. Just talking with Ward has got me thinking of having the ability to do series or parallel capability with the blowers. This offers several additional options. It complicates the plumbing, but not to much. I will post pictures when I have something....
Any comments?
TIA,
Mark