dlcw
07-14-2009, 06:03 PM
SB Link Gurus,
I'm having a small-brain-syndrome attack and have been trying to get my head wrapped around the whole concept of flip operations with SB Link.
I've done this operation ALOT in the saw and router world where I'm coming from but not in this CNC world that I'm very new too.
I've read and re-read the manual several times and my brain still can't get around it.
I've done a set of 4 night stands in eCabinets that I will be cutting out of cherry plywood ($100/sheet) and don't want to screw anything up. I have 4 parts that need flip operations to cut half-blind dados.
When setting a part for flip operation, how is the piece positioned on the table so that SB link knows where to make the milling operation? The picture below has 3 of the 4 parts (the 4th is on another sheet of ply) that show the green milling operation that will be the flip operation. Once all the milling and cutout are completed on the this sheet, where and how do I position/orient these parts on the table to have the dado milling operation completed on the flip side (without messing up the part and me pulling what little hair I have left out)? My milling and outline cutting operations are being done with a 3/8" compression bit. My table X0,Y0 is located at the lower left corner of the sheet for all my SB Link operations. Any help would be greatly appreciated.
666
Thanks,
Don
www.diamondlakewoodworks.com (http://www.diamondlakewoodworks.com)
I'm having a small-brain-syndrome attack and have been trying to get my head wrapped around the whole concept of flip operations with SB Link.
I've done this operation ALOT in the saw and router world where I'm coming from but not in this CNC world that I'm very new too.
I've read and re-read the manual several times and my brain still can't get around it.
I've done a set of 4 night stands in eCabinets that I will be cutting out of cherry plywood ($100/sheet) and don't want to screw anything up. I have 4 parts that need flip operations to cut half-blind dados.
When setting a part for flip operation, how is the piece positioned on the table so that SB link knows where to make the milling operation? The picture below has 3 of the 4 parts (the 4th is on another sheet of ply) that show the green milling operation that will be the flip operation. Once all the milling and cutout are completed on the this sheet, where and how do I position/orient these parts on the table to have the dado milling operation completed on the flip side (without messing up the part and me pulling what little hair I have left out)? My milling and outline cutting operations are being done with a 3/8" compression bit. My table X0,Y0 is located at the lower left corner of the sheet for all my SB Link operations. Any help would be greatly appreciated.
666
Thanks,
Don
www.diamondlakewoodworks.com (http://www.diamondlakewoodworks.com)