Results 1 to 3 of 3

Thread: School Art Installation Project

  1. #1
    Join Date
    Nov 2011
    Location
    Boston Mass.
    Posts
    8

    Default School Art Installation Project

    I posted a question back in the beginning of November asking about cutting down milling times for 23/32 plywood. I was told to purchase a table saw instead of bothering with the CNC. Anyway long story short, the Installation project is complete and just in time, also CNC worked flawlessly (mostly.)

    A little about the project.

    Upon returning from our trip to Texas and the Big Bend National Park, we got the opportunity to design and build an exhibit based on ideas from our trip. Words and ideas that were thrown around during the trip and during conceptual phases were:

    Horizon
    Scale / Scalessness
    Density

    These ideas / words were carried through the design process and brought to a reality which is this project. The purpose was to re introduce the horizon to the city of Boston through the density of the members, as well as create an idea of scalelessness (could be trees or could be grass).
    The members range from 9",1'6" and 3' apart; as well as a height change from 9' to 19'. The profiling of the members at eye level allow a horizon to appear especially at the most dense area. (This profile was the reason the table saw idea would be just as much a pain as the CNC cutting times.) Each member is also engraved with a number to identify its location on the grid we designed.

    152 045 (152) = height 15'2" (045) = number on the grid

    255 being the last member


    Here are a few images of the final installation
    Attached Images Attached Images

  2. #2
    Join Date
    Nov 2011
    Location
    Boston Mass.
    Posts
    8

    Default

    More pictures
    Attached Images Attached Images

  3. #3
    Join Date
    Nov 2006
    Location
    Waterville, Maine
    Posts
    285

    Default

    Lovely. Looks like it was a very rewarding project.

Similar Threads

  1. Not Shopbot but a really cool woodworking school project!
    By chiloquinruss in forum ShopBot in Schools
    Replies: 3
    Last Post: 08-27-2013, 11:57 AM
  2. Spare parts for High School project
    By taskins in forum ShopBotter Message Board
    Replies: 0
    Last Post: 11-14-2012, 10:26 PM
  3. First installation - Installing X-car
    By walnutman in forum Archives2007
    Replies: 24
    Last Post: 05-14-2007, 08:03 PM
  4. Albany High School School Son
    By ryan_slaback in forum Folder 2007
    Replies: 0
    Last Post: 01-16-2007, 05:31 PM
  5. Installation Tips
    By Support (Admin) in forum Archives thru2004
    Replies: 10
    Last Post: 12-06-2003, 09:26 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •